Transportation Performance Measures (MN)

All Metropolitan Planning Organizations (MPOs), including the MIC, are required to establish targets for federal performance measures that address:

  • Safety
  • Infrastructure (bridges and pavement) Condition
  • System (travel time) Reliability
  • Transit Performance and Transit Asset Management

As a bi-state MPO, targets are developed and adopted separately for each state; the targets on this page apply to the Minnesota section of the MIC planning area.

(See the Performance Measures page for the  Wisconsin section of the MIC planning area).

Performance measure targets adopted for the Minnesota section of the MIC planning area.

Federal requirements direct us, as a Metropolitan Planning Organization (MPO), to establish targets for federal performance measures (PMs) that address safety, condition of bridges and pavement, system (travel time) reliability, transit performance and transit asset management.

MPOs have the option to either use the performance targets adopted by the state DOT or develop their own, quantifiable targets. The MIC has opted to adopt the targets established by MnDOT for the Minnesota section of the MIC planning area.

Those PMs and the current targets established for each are shown below. They are reported and discussed in our 25-year long-range Metropolitan Transportation Plan, linked to the investment priorities in our four-year Transportation Improvement Programs (TIPs), and incorporated into our annual planning processes.

About the Project

Questions?

Connect with Us

If you have questions or feedback about the project, you’re encouraged to reach out to the project contact at any time. The MIC team welcomes comments, ideas, or requests for more information throughout the planning process.
Mike Wenholz

Mike Wenholz

Principal Planner

PM1 (Safety) Targets for 2026

In accordance with the USDOT/FHWA strategy to achieve national transportation performance goals, every state DOT and MPO must annually adopt five Safety Performance Measure (PM1) targets. MPOs have the option to either adopt the targets established by the state or develop their own targets.

The MIC passed Resolution 26-01 adopting MnDOT’s statewide Safety Performance Measure targets for the Minnesota portion of the MIC Planning Area for CY 2026, as follows:

Performance Measure Baseline (2020-2024 Rolling Average) 2026 Safety Targets (no change from 2025)
Number of Fatalities 442.4 352.4
Fatality Rate
(per 100 million VMT)
0.780 0.582
Serious Injuries 1,854.0 1463.4
Serious Injury Rate
(per 100 million VMT)
3.264 2.470
Non-motorist Fatalities & Serious Injuries 303.6 258.4

VMT= Vehicle Miles Traveled

Public notice posted 1/07/25: Public comments will be taken about the proposed PM1 Safety Targets when they are presented for adoption at the January 15, 2025 MIC Policy Board meeting.

Infrastructure Condition (PM2) Targets for 2022-2025

Adopted: MnDOT’s 2- and 4-Year Performance Measure Targets for Infrastructure Condition

By June 14, 2023, all MPOs across the country must adopt 2- and 4-year performance measure targets for Infrastructure Condition (PM2) for the second performance period 2022-2025. They have the option to either use the PM2 targets adopted by the state DOT or to establish their own, quantifiable 4-year targets.

The MIC passed Resolution 23-10 adopting MnDOT’s 2- and 4-year PM 2 Infrastructure Condition performance measure targets for 2022-2025, as follows:

PM2 / Infrastructure Condition Performance Measure Targets

Measure Baseline 2-Year Target (2023) 4- Year Target (2025)
Percent of NHS* Bridges in Good Condition 31.8% 30% 35%
Percent of NHS Bridges in Poor Condition 5.8% 5% 5%
Percent of Interstate Pavement in Good Condition 70.9% 60% 60%
Percent of Interstate Pavement in Poor Condition 0.6% 2% 2%
Percent of Non-Interstate NHS Pavement in Good Condition 61.4% 55% 55%
Percent of Non-Interstate NHS Pavement in Poor Condition 0.5% 2% 2%

*NHS = National Highway System

Public notice posted 4/11/23: Public comments will be taken about the proposed PM2 Infrastructure Condition targets when they are presented for adoption
at the April 19, 2023 MIC Policy Board meeting.


System Reliability (PM3) Targets for 2022-2025

Adopted: MnDOT’s 2- and 4-Year Performance Measure Targets for System Reliability

By June 14, 2023, all MPOs across the country must adopt 2- and 4-year performance measure targets for System Reliability (PM3, defined as travel time reliability off- and on the NHS and freight travel time reliability on the NHS) for the second performance period 2022-2025. They may either adopt their state’s targets or establish their own, quantifiable 4-year targets.

The MIC passed Resolution 23-11 adopting MnDOT’s System Reliability performance measure targets for 2022-2025, as follows:

PM3 / System Reliability Performance Measure Targets 

Measure Baseline 2-Year Target (2023) 4-Year Target (2025)
Percent of Reliable Person Miles on the Interstate 94.4% 82% 82%
Percent of Reliable Person Miles Reliable on the Non-Interstate NHS 96.1% 90% 90%
Truck Travel Time Reliability Index 1.24 1.4 1.4

*NHS = National Highway System

Public notice posted 4/11/23: Public comments will be taken about the proposed PM3 System Reliability targets when they are presented for adoption at the April 19, 2023 MIC Policy Board meeting.


Public Transportation Agency Safety Plan (PTASP) Performance Measure Targets

Adopted: The DTA’s Public Transportation Agency Safety Plan (PTASP) Performance Measure Targets

On July 19, 2018, the FTA published the Public Transportation Agency Safety Plan (PTASP) Final Rule, which requires certain operators of public transportation systems that receive federal funds, such as state DOT’s and local transit authorities such as the Duluth Transit Authority (DTA), to establish targets for safety performance measures identified in the National Public Transportation Safety Plan.

Here are the Duluth Transit Authority’s targets, effective May 28, 2020, and included in its most recent (8/30/23) Public Transportation Agency Safety Plan (PTASP):


Transit Asset Management (TAM) Targets

Adopted: The DTA’s Transit Asset Management (TAM) Performance Measure Targets

In accordance with federal law, each MPO (the MIC) must establish Transit Asset Management targets in conjunction with transit agencies operating within the MPO (the Duluth Transit Authority or DTA).

The MPO and transit provider have the option to either adopt the Transit Asset Management targets adopted by the state or to develop their own targets. The DTA decided to formulate and adopt their own targets that were approved by the DTA Board of Directors on 8/29/18.  The MIC Policy Board passed Resolution 18-18, adopting those targets for both the Minnesota and Wisconsin sides of the MPO, as follows:

Asset 4-Year Target
Rolling Stock <10% of active Fixed Route vehicles and <20% of Paratransit vehicles have reached their useful life.
Equipment <35% of equipment (i.e. service vehicles) have reached their useful life.
Parking/Pedestrian Facility <10% of parking/pedestrian facilities have a condition rating below 3 based on FTA’s TERM scale.
Administrative/Maintenance Facility <20% of facility elements within the Administrative & Maintenance Facility have a condition rating below 3.

 


Sign up for
project updates

Get updates about this project as it moves forward, including any new information shared by DSMIC or project partners.

"*" indicates required fields

Please note the MIC project, plan or committee of interest to you. We will send periodic emails about the topic(s) you specify, as information become available.